Schedule

The schedule for this project was determined and guided by the gantt chart in figure D1. The gantt chart included estimations of how much time was spent on each part and how much time was actually spent on them. The schedule is broken up into terms.

Fall Quarter

The fall quarter consisted primarily of brainstorming, design and analysis. The result of the work from this quarter was a design proposal. The gantt chart scheduling (Figure D1) for fall quarter can be seen below. 

Screenshot 2023-05-12 090804.png

Figure D1

Winter Quarter

Winter quarter consisted primarily of redesign, manufacturing, and assembly. The result of the work from this quarter was a finished RC car. The gantt chart scheduling (Figure D2) for winter quarter can be seen below. 

Screenshot 2023-05-12 090511.png

Figure D2

Budget

Screenshot 2023-03-06 084152.jpg

Figure D2