RC BAJA: SUSPENSION AND STEERING
Schedule
The schedule for this project was determined and guided by the gantt chart in figure D1. The gantt chart included estimations of how much time was spent on each part and how much time was actually spent on them. The schedule is broken up into terms.
Fall Quarter
The fall quarter consisted primarily of brainstorming, design and analysis. The result of the work from this quarter was a design proposal. The gantt chart scheduling (Figure D1) for fall quarter can be seen below.

Figure D1
Winter Quarter
Winter quarter consisted primarily of redesign, manufacturing, and assembly. The result of the work from this quarter was a finished RC car. The gantt chart scheduling (Figure D2) for winter quarter can be seen below.

Figure D2
Budget

Figure D2